WARRINGTON NHS HOSPITAL BIRTHING POOL

WARRINGTON NHS HOSPITAL BIRTHING POOL

We had the electrical Lighting & Power, CCTV, Fire, Access Control, Induction Loop, Intruder Alarm & Data Packages.

The Programme was a 39 Week Turn round to Refurbish the Original Ward to create a Bespoke new Birthing Pools an NHS project now rolled out to all sectors up and down the UK which working through live offices and Corridors.

We delivered the project on programme, which has now become a figure head for Birthing Technology, with a new “Starlight Lighting” introduced as part of the Design/Client Requirements please refer to the Video Link:

https://youtu.be/ZFq78FP8J1s

The works consisted of:

  • Electrical Smaller Power and Lighting
  • Data
  • CCTV
  • Intruder Alarm
  • Nurse Call System
  • Access Control
  • Induction Loop

READ ARTICLE

CLATTERBRIDGE CANCER CENTRE NHS

CLATTERBRIDGE CANCER CENTRE NHS

We had the electrical & life Safety Package to wire and install a “Link Bridge” from the new Clatterbridge Cancer Hospital to the Existing Royal Liverpool Hospital for the Use of transporting Beds through the Hospital.

Our IED Principles were a new Electrical Sub Main fed from the Clatterbridge Main Plant Room to supply a Distribution Board Mounted in the Clatterbridge Link Bridge Main Entrance to supply the Link Bridge Lighting, Power and Heating System all surface mounted, we also installed a new Access Control system to couple to the CCTV Existing System.

The works consisted of:

  • CCTV
  • Electrical Distribution
  • Lighting
  • Heating – Corridor and Over Door
  • Access Control

READ ARTICLE

LIVERPOOL UNIVERSITY HOSPITALS 5th FLOOR REFURBISHMENT

LIVERPOOL UNIVERSITY HOSPITALS 5th FLOOR REFURBISHMENT

This project had a value of £270,000 and was completed in December 2020.

We had the electrical Lighting & Power, Flooring, Decorations and Finishes, Joinery, Data Packages.

The Programme was a 4 Week Turn round to Strip out 40 Offices, of all Decorations, lighting & Power, Floors, perimeter Benches containing Gas and Water, then removal of all Lab equipment dispose away from site whilst working through live offices and Corridors.

We re-decorated all 40 rooms painting the Ceilings, re-lay the Floor and re-wired the Lighting in Power changed all Office data and Corridor Lighting and tested on Completion.

The works consisted of:

  • New Floors
  • Electrical & Data
  • New Painting
  • Boxing in Joinery

READ ARTICLE

ALFRED H KNIGHT – VILLIERS ROAD

ALFRED H KNIGHT – VILLIERS ROAD

The project was valued at 1.5 Million, the project turnaround was 40 weeks delivered on time, the Building Delivery and use is to be used for Copper & Mineral Annalistic Testing.

Our Client Alfred H Knight are specialists in Copper Mining and pride themselves on the land mining and testing to source, test & Value through land sea and air all landfill metals and minerals, they provide a service to its valued customers primarily Copper landfill, and offer a service to value and transport the mineral to ensure its value for re-sale and use to a worldwide clientele base, IED were the Main Contractor responsible for all Building Services relating to:-

  • Ground Works & Slab Installation for the PH Plant,
  • All External Cladding & Insulation to the existing superstructure,
  • Internal and External Brick and Blockworks,

Internal Decorations for:-

  • Walls
  • Floors
  • Ceilings
  • Doors & Windows
  • Mechanical Installation
  • Electrical Installation
  • CCTV
  • Intruder
  • Access Control
  • Induction Loop
  • Fire

 

 

READ ARTICLE

EVERTON FC – FINCH FARM TRAINING FACILITY

NEW 1MVA SUB-STATION AND NEW LV SWITCH ROOM

Finch Farm is the main training facility for Everton Football club in Merseyside. It also incorporates other facilities such as an education centre, media centre and various football pitches/training pitches.

The existing sub-station was at capacity and to facilitate future expansion plans a new 1Mva sub-station and LV switch room were required. This project incorporates the work required in relation to diverting existing cables and protecting other live services along the footpath where the new substation is being constructed.

The Scope of the Contract is to undertake the concurrent disconnection of various existing SWA cables from the existing switch panel, jointing and reconnecting to the new switch panel in the new client owned LV switch room. The fundamental to the success of the scheme was to ensure that downtime to the facility was minimised at all times.

The works consisted of:

  • 1000A LV Switch Panel
  • Cable Jointing
  • Lighting
  • Power
  • Fire Alarm

The works were completed in February 2020


 

 

READ ARTICLE

Avrenim – Broadgreen Hospital, Alexandra Wing, Ward 7

Completed in January 2020 the project was to completely refurbish the existing ward and upgrade the facilities to create additional bed spaces which included structural alterations, electrical re-fit, new LED lighting, new flooring and suspended ceilings. Works within selected adjacent areas of Ward 7 remained occupied and in use whilst refurbishment works were in progress. The works consisted of:

  • New LED Lighting and Emergency lighting Upgrade
  • Small power alterations
  • Fire alarm alterations
  • Door access
  • Structured wiring
  • New FD60 fire doors
  • New nurse station
  • Suspended ceilings
  • Flooring
  • Decorating
  • Fire stopping

READ ARTICLE

Avrenim – Dental Hospital Restorative 5 & 4th Floor Corridor Refurbishment

Restorative 5

The refurbishment of existing dental teaching examination room housing 15 dental chairs. The works comprised of site clearance and preparation works, floor finishes, decorations to new and existing plaster and timber surfaces, new suspended ceiling installation with associated work to new LED lighting, sundry fixtures and fittings and associated mechanical services.

4th Floor Corridor

The refurbishment of the University of Liverpool corridors consisting of new LED lighting, structural door openings, suspended ceilings, floor coverings and decorations.

Works consisted of:

  • New LED Lighting and Emergency lighting Upgrade
  • Small power alterations
  • Fire alarm alterations
  • Suspended Ceilings
  • Flooring
  • Decorating

 

 

READ ARTICLE

IED completes refurbishment at The University of Liverpool (Whelan and Thompson Yates Building)

Whelan Building

The refurbishment of existing seminar room 101A/B to form new clinical inspection / practical use facility, Whelan Building, North Campus. Works comprised of site clearance and preparation works, floor finishes, decorations to new and existing plaster and timber surfaces, new suspended ceiling installation with associated work to lighting, sundry fixtures and fittings and associated mechanical and electrical services.

Thompson Yates Building

The refurbishment of main entrance area parquet flooring & refurbishment of corridors consisting of new LED lighting, suspended ceilings and decorations.

Works consisted of:

  • New LED Lighting and Emergency lighting Upgrade
  • Small power alterations
  • Fire alarm alterations
  • Structured wiring
  • Suspended Ceilings
  • Flooring
  • Parquet flooring repairs
  • Decorating

 

READ ARTICLE

IED completes a full electrical fit-out at Killer Ink, Venture Point, Liverpool.

Killer Ink, Venture Point, Liverpool.

  • Project Value: £232,000
  • Project Type: New Build
  • Project Aim: Complete Electrical Fit Out
  • Completion Date: March 2019

The construction of a new warehouse and office development located within the Speke area of Liverpool. The development will be located on the Venture Point West estate. The Warehouse and Office was constructed from a steel portal frame structure which was over cladded, there was  a portion of curtain walling to the East, South and

West elevations of the office building. The structural wall between the office space and warehouse was constructed from dense concrete block.

The warehouse consisted generally of high bay racking which occupied roughly two thirds of the warehouse, there was also be a goods in area and a goods out area to the East elevation. In between these two areas a single storey timber construction comprising of an Accessible WC, Warehouse Office and a Manager’s Office.

This construction housed and handled the main day to day operation of the warehouse and as such was serviced to accommodate the activities which will be undertaken.

The adjoining main office building was of a two storey construction, on the ground floor the main welfare facilities were housed along with some office space and the main entrance areas. The first floor contained office accommodation, server room along with a meeting rooms and some ancillary spaces.

 

 

READ ARTICLE

IED will be assisting the Armed forces and NHS Nightingale in its fight against COVID 19

IED will be assisting the Armed forces and NHS Nightingale in its fight against COVID 19 our first Lancashire site is Tom Finney Stadium Preston.

READ ARTICLE